During 1.5 years, the finishing works have been being carried out on the area of more than 1805 sq.m. The decoration has been made using the high-quality building materials, and the room has been decorated according to the design project - in European style. The 1st floor area of 132 sq.m. has been completed, the work on the construction of the facade of the building has been carried out (insulation, plastering, painting). Also, all elements of the facade of the completed storey have been constructed in accordance with the architecture of the 2 old floors of the building. Landscaping of the yard, as well as the adjacent territory, have been performed.