The reconstraction of the building for the Municipal Service Center

Description

The work on the reconstruction of the Municipal Service Center had been performed qualitatively and in time. The facility has been put into operation in July 2018.

The area of reconstruction was 2112.8 square meters (three floors). One-floor annex with an area of 2596.7 sq.m has also been built. The works have been carried out using the new technologies and the high quality materials. We've performed the following works: finishing, insulation of the facade, replacement of the windows on all 3 floors, roofing and electrical works, plumbing, air conditioning, ventilation, fire protection of the building and landscaping.

The construction and finishing works, as well as the laying of the engineering networks, have been performed by us without subcontractors

Construction object
Project photo